Procuring Long Lead-Time Items with SAP PS

Known pain points, surprisingly smart solution

Tight deadlines, long lead times? The SAP Project System ensures everything runs like clockwork.

Project-based business is complex – but procuring long-lead items doesn’t have to be. With the SAP Project System (PS) in S/4HANA, you can now manage critical components smartly and stress-free, without multiple orders.

Structural and temporal decoupling of long-lead item procurement from the actual construction and assembly process within an SAP Project System

Overview: Procuring long lead-time items with SAP PS

Construction is still underway, but the procurement department has to place the order already?

In the mechanical and plant engineering sector, this is the norm. Evolving bill of materials structures, constant changes and overwhelming deadline pressure characterise the project business. Those who fail to time long-lead items perfectly jeopardise the delivery time – or risk costly duplicate orders due to a lack of coordination between construction and procurement.

The solution is often closer than you might think: SAP PS offers a genuine insider feature in its preliminary planning. A surprisingly simple method that elegantly resolves this logistical dilemma.

Security of supply guaranteed: the dilemma of advance procurement

To ensure delivery times, known long-lead items must be identified at an early stage. Theoretically, the simplest way is to flag long-lead items directly in the assembly bills of materials and assign them to the network activity for advance procurement via the source. The practical hurdle is that these bills of materials are still in the middle of the development process and are blocked for procurement.

Avoiding the manual pitfall: As a workaround, many companies opt to manually assign long-lead items as components within the network activity. However, this carries a massive risk of error: as soon as the final assembly bill of materials is released, a dangerous duplication occurs. You then have to manually delete either the component in the network or the long lead-time item in the bill of materials – an error-prone process that almost inevitably leads to costly duplicate orders.

The smart solution in the SAP Project System in S/4HANA: In the dynamic project business of mechanical and plant engineering, planners need to place orders whilst the bill of materials is still being finalised in the system. This is precisely where SAP preliminary planning comes into play. This often underestimated function elegantly resolves the conflict between an incomplete design and early procurement – without any manual maintenance effort whatsoever.

Onur Özsoy

When construction and procurement teams need to work together under time pressure, SAP PS provides the necessary clarity: procuring long lead-time items at an early stage, accurately reflecting changes and avoiding duplicate orders.

Onur Özsoy, Senior Consultant PP CONSILIO GmbH Contact expert

A clever way to avoid duplicate orders: automated SAP accounting

Preliminary planning at project and network level sounds logical in theory – but what does it look like in practice? Preliminary planning requirements can be generated directly via bill of materials structures in SAP Project Builder and linked to WBS elements.

The secret to a smooth process lies in the customisation of the material master for long-lead time items:

  • Strategy group 70 (preliminary planning at assembly level)
  • Mixed Planning 1 (assembly-level preliminary planning with final assembly)

Automated precision: As soon as the final bill of materials is released and transferred to the project, the following happens: the specific reservations for long-lead items are automatically offset against the preliminary planning requirements within the same WBS element, thereby reducing them. The result: perfect timing without the risk of duplicate orders.

The system’s control centre is the SAP Fiori app ‘Project Builder’ for the flexible maintenance of projects, WBS elements and networks in real time.

Process Booster Pre-allocation: intelligent separation made easy

How do you keep a clear overview within the system? The practical solution is remarkably simple: using two bespoke network profiles provides a crystal-clear visual and logical distinction between preliminary planning and the subsequent, specific bill of materials reservations.

The dummy bill of materials trick for maximum efficiency: To minimise manual effort, simply group time-critical long lead-time items into dummy bills of materials. Using the standardised bill of materials transfer function, these packages can be assigned directly to the relevant network activity with just a few clicks. This saves valuable time at the start of the project and eliminates typing errors in the system.

Conclusion: Maximum planning certainty with minimal risk

The integrated preliminary planning feature in the SAP Project System in S/4HANA resolves one of the biggest dilemmas in plant engineering: it ensures the timely procurement of critical long lead-time items, eliminates the risk of costly duplicate orders and keeps your delivery times short.

The highlights at a glance

  • Seamless integration: SAP PS integrates with your existing SAP modules with a high degree of flexibility – without restricting your tried-and-tested workflows in any way.
  • Smart monitoring: A monitoring system running in the background immediately identifies weaknesses in your processes, enabling you to take targeted corrective action straight away.